Machinery & industrial equipment

ERP Software for Machinery and Industrial Equipment Manufacturers

Multi-level BOMs, material planning, machine-wise capacity, outside fabrication and work-order costing in one system – so every machine you build ships on time and at the margin you quoted. Approvals and alerts on WhatsApp.

✓ Engineering and machinery manufacturers among our clients   ✓ On-site or remote, across India

Work order WO-2207Sample data
Product A · machine assembly · 4 units · Tejaxo Customer
BOM tree (level 3)
Product A4 nos
└ Frame assembly4 nos
└ Base plate - Product B8 nos
└ Drive unit (imported)4 nos
└ Painting - job work4 nos
Material
₹ 6.2 L
Machine + labour
₹ 1.4 L
Margin
18%
WhatsApp alert
2 parts short for WO-2207 - PO waiting for approval
Illustration with sample data

Why machine builders lose margin

Complex products, long lead times, thin margins

A single machine can have hundreds of parts, several levels of assemblies, imported components and work done by outside vendors. When all of that lives in Excel and phone calls, shortages appear at assembly and the real cost is known only after delivery.

BOM changes lost in Excel

Purchase buys against an old BOM and the store issues the wrong revision.

Shortages found at assembly

One missing part holds the whole machine and the delivery date slips.

Vendor work out of sight

Fabrication, plating and painting at vendors – nobody knows what is pending where.

Cost known after delivery

Material, machine time and labour per order are added up when it is too late to act.

One continuous flow

From enquiry to dispatch for every machine

01 · Enquiry & quote

Quotation from your price lists, sent as a branded PDF.

02 · Order & schedule

Sales order with delivery dates per line.

03 · BOM & planning

Releasing the order explodes the BOM; MRP raises requisitions for what is short.

04 · Purchase & imports

POs with approvals; imports with Bill of Entry and landed cost.

05 · Fabrication & machining

Job cards on each machine’s hours, or out to job workers on a gate pass.

06 · Assembly & quality

Stage-wise and final inspection, rejection with reason, heat number and MTC.

07 · Dispatch & invoice

Packing, GST or export invoice and receipt, each pulled from the step before.

Built for machine builders

What Tejaxo ERP controls in a machinery plant

Multi-level BOM

Any machine as an expandable BOM tree to any level, scaled to the build quantity; search by name, code, part number or BOM number. Drawing and BOM data from AutoCAD into item masters.

Material planning

Master production schedule from orders and stock; MRP requisitions for shortages; re-order levels, stock ageing and ABC / FSN analysis.

Machine-wise capacity

Job cards scheduled forward on each machine’s hours; machines needed vs available per machine type for the month, with load %.

Fabrication and vendor job work

Sheet metal, fabrication, welding, plating, powder coating and painting at vendors on returnable gate passes, with pending, ageing, charges and ITC-04.

Work-order costing

Issued material at its receipt rate, machine minutes, labour and overhead per work order, compared with the invoiced value – real profit per machine.

Quality and traceability

Incoming and in-process inspection, PPM, defect Pareto, first-time-right and cost of poor quality; heat number and MTC; batch traceability forward and backward.

Imports and exports

Import purchase with Bill of Entry, landed cost and forex; export invoices under LUT or with IGST, shipping bill and BRC.

Purchase control

PO approvals, gate entry, GRN, incoming QC and 3-way match; vendor rating, price trends and schedule vs actual.

For the owner

Every order, shortage and approval on one screen

The Owner’s Cockpit shows order backlog, dispatches, receivables and cash on one screen. Ask Tejaxo AI a question in plain language, and approve purchase orders on WhatsApp from anywhere. Already running SAP, Microsoft Dynamics or Tally? Tejaxo can extend it instead of replacing it.

Order backlog and OTIF

Which machines are late, which are short of parts, which ship this week.

Approvals in one tap

Purchase orders and other approvals from the action inbox or WhatsApp.

Full audit trail

Every entry, approval and AI action recorded – who, what and when.

Who it is for

Machinery and equipment makers

  • Industrial machinery and special-purpose machines
  • Material handling and lifting equipment
  • Lubrication, hydraulic and pneumatic systems
  • Instruments, gauges and calibration services
  • Fabricated equipment and assemblies
  • Component suppliers to machine builders – machined, sheet metal, forged and cast parts

Reports owners use

1000+ ready reports

Order backlog and OTIF · work-order P/L · schedule vs actual · shortages and pending purchase · vendor job-work pendency and ageing · stock ageing and ABC · OEE, scrap and yield · PPM and cost of poor quality · import and export registers · GST registers – plus live dashboards and Power BI.

Where we work

Machinery ERP across India, on-site support in Delhi NCR

Tejaxo implements on-site and remotely for machinery and equipment manufacturers anywhere in India. From our Palwal office the team reaches the engineering belts of Faridabad, IMT Manesar, Bawal, Bhiwadi, Neemrana, Noida and Ghaziabad within hours. See also ERP for forging, ERP for auto components, manufacturing ERP in Faridabad and the interactive demo.

Related: production planning and MRP · inventory management · ITC-04 for job work

FAQ

Questions machine builders ask

One system for a machine or equipment builder: quotations and orders, multi-level BOMs, material planning, purchase and imports, in-house and outside fabrication, assembly, quality, dispatch, exports, GST and accounts.

Yes. Any machine can be opened as an expandable BOM tree to any level, with quantities scaled to the build quantity. Drawing and BOM data from AutoCAD can be brought into item masters and BOMs.

Material sent to job workers goes out on a returnable gate pass and comes back against it. Pending material, ageing, job-work charges and ITC-04 come from the same records.

Yes. Work-order costing adds issued material at its receipt rate, machine time, labour and overhead, and compares the total with the invoiced value.

Yes. Import purchase with Bill of Entry, landed cost and foreign-currency payments, and export invoicing under LUT or with IGST, with shipping bill and BRC details.

Yes. Tejaxo implements on-site and remotely across India, with fast on-site support in Faridabad, IMT Manesar, Bawal, Bhiwadi, Neemrana, Noida and Ghaziabad.

See it on your own machine and BOM

Book a free demo at your plant or online. The second demo runs on your own items, BOMs and customers.

Tejaxo ERP is a scalable enterprise resource planning solution designed to help businesses automate operations, improve efficiency, and gain real-time insights. We empower organizations with secure, customizable, and growth-ready ERP solutions.

Stay Connected

Subscribe to get ERP insights, product updates, and business automation tips directly in your inbox.

Phone / WhatsApp: +91 96717 27474

Email: info@tejaxo.com

Address: 1st Floor, Bali Nagar, New Colony Road, near Haryana Public School, Camp Market, Agra Chowk, Palwal, Haryana 121102

You have been successfully subscribed! Oops! Something went wrong, please try again.

© 2017–2026 Tejaxo Technologies Pvt. Ltd. All rights reserved.

Designed for growing businesses | Secure • Scalable • Customizable